Contact | Links |
The
full story
is available on the News page.
View of trail corridor in center of Coatesville looking west from near Milton Street.
The right half has final smooth packed stone surface for equestrians. The left half has coarse packed stone surface
in preparation for future paving of bike/pedestrian trail.
View of trail corridor with parallel drainage swale to the right of the
trail boundary posts.
View of trail corridor looking east from near the center.
View of trail corridor looking east from near Mill Street.
Close view of drainage swale up to primary drain under the trail.
Close view of primary drain collector.
Coatesville performing the heavy work to install the initial trail boundary posts. (May 2013)
Coatesville performing the heavy work to install the final trail boundary posts. (October 2013)
View of corridor from the west before transformation. (2011)
Close view of corridor before transformation. (2009) Initial location of equestrian
hitch rail before the town dedicated a portion of the corridor all the way through town.
Close view of environment around the town's corridor before transformation. (2009)
Copyright © National Road Heritage Trail, Inc. 2023 Site design by zoewhitedesign |