Contact | Links |
Horse trailer parking in Amo has been re-opened now that the town of Amo has completed
construction of a new storm drain system for the town. Trailer access to this area in
front of the Interurban Depot has been slightly modified by the construction.
Vehicles access the parking area from the gravel lot directly in front of the depot or
from South St (CR 500 S). The new curbs and sidewalks along Pearl Street prevent direct
access to and from Pearl Street.
Copyright © National Road Heritage Trail, Inc. 2023 Site design by zoewhitedesign |